OUR PROJECTS:

Southern boiler house of the “Kyzylordateploelectrocenter”

Kyzylorda

Supply of 3 steam boilers of 21 t/h "BONO ENERGIA" SG2000/15/NG+FO/2P/OPTI/ SWHE

2024-2025


(in the production process)

3.9 MW boiler house of “Lomonosov”

Boraldai village

Supply of 2 Viessmann Vitoplex-200 1950 kW boilers with combined burners CIB Unigas, Commissioning works

2024

Family ROCK Festival


"ASP Racing Arena - Bungalow"

Comprehensive supply, installation, and installation of a 2.24 MW boiler house (2 Viessmann Vitoplex 100 1120 kW boilers; CIB Unigas burners, WILO pumps)

2024

Family ROCK Festival


"Karting - Hotel - Restaurant"

Comprehensive supply, installation, NDP of a 4 MW boiler (2 Viessmann Vitoplex 100 2000 kW boilers; CIB Unigas burners, WILO pumps)

2024

3.9 MW boiler house

"Microdistrict Cheryomushki"
Boraldai village

Delivery of 2 Viessmann Vitoplex-200 1950 kW boilers with combined CIB Unigas burners, Commissioning

2024

Guest house "Cedar"

Almaty

Boiler room reconstruction (supply of 2 Viessman Vitoplex 100 780 kW boilers with CIB Unigas burners and auxiliary equipment) installation supervision, Commissioning

2023

Boiler house "Vodnik 2"

Boraldai village

Comprehensive modernization of the boiler room: replacement/installation of 2 Viessmann Vitomax M62D 4200 kW boilers with CIB Unigas burners, heat exchange and pumping equipment, installation, Commissioning

2023

Frütta - freeze-drying and shock-freezing plant for fruits and berries

Ili district of Almaty region

Supply of equipment for boiler rooms, support:

1. Steam boiler house 8,4 t/h (first stage 5,6 t/h: 2 boilers Vitomax 200-HS M73C 2,8 t/h Viessmann)


2. 4.6 MW hot water boiler (2 Vitomax 100-LW 2.3 MW Viessmann boilers) with CIB Unigas burner equipment

2021-2022

The production base of the Poultry Farm “The Northern Broiler”

Design and supply of equipment for 4.5 MW boiler rooms (Phase I: 1.3 MW and 0.116 MW boiler rooms)

2022

“1.7 MW boiler house (phase I)”

Ryskulovo, Almaty Region

Reconstruction of boiler room, phase I, 1.7 MW: replacement of two 850 kW boilers, design, assembly work, commissioning

2020-2021

Construction of a uranium processing complex in the southern part of deposit No. 2 of the Tortkuduk section of the Moiyunkum field

Design of a 2.9 MW modular boiler house based on VIESSMANN VITOPLEX 200 boilers

2020-2021

Araltuuz JSC is a producer of food and technical salt

Kyzylorda Region

Supply of burner equipment

2020